Construction progress of Khenpo Karma Wangyel’s house

We are incredibly thankful for all the generous donations we have received! The construction of the house is nearing completion.


What We’ve Accomplished

In the last few days, we have made significant progress:

  • The oak parquet flooring inside the house is now completely finished. We were able to find high-quality, second-hand flooring from Sweden that was three times cheaper than new materials.
  • The heat pump was installed.
  • The main construction of the terrace has been completed.

Remaining Tasks

All that is left to do now is:

  • Ceiling insulation
  • Interior and exterior painting
  • Floor oiling
  • Deck board installation
  • Bathroom work (tiling)
  • Installing kitchen furniture and plumbing
  • Final electrical works
  • Road works. We still need to make over 150 meters of road leading to the house, along with a small parking lot. For the road, we need to raise a total of at least 2,000 euros.

How You Can Help

Your donation can help us finish the road!

Donation Details

  • Receiver: YESHE KHORLO EESTI MTÜ
  • Account: EE212200221065708346
  • SWEDBANK, SWIFT code/BIC: HABAEE2X
  • Paypal: yeshekhorloest.com

Leave a Reply

Your email address will not be published. Required fields are marked *