Lot of time has passed since the last post, but also lot of work done (the main work is still done by Yeshe Khorlo board members, some friends have come help us but we have had to hire also some more workforce to do some works that we do not know exactly how to do).
There are five houses now, a gate as well. In three houses, painting works are in progress (lime plastering works are done), one wall got the Tibetan style wallpaper (the abundance of Vajrayana) bathroom works will start from Monday 23th of July (preparations are done by ourselves).
In two houses, last layer of insulation has to be put on place, then the construction of the inside walls can start.
Also an excavator will come on the 24th of July to clear everything around the houses.
We still have some money left but the works are progressing fast and every day, we need to pay several bills, thousands of euros (material for outside boards: 700 euros, works related to external lining installation: 1700 euros, and several other smaller bills of hundreds of euros (paint, fence material, moisture barrier for bathroom, material for the gate, bush cutting works – sorry, we got too exhausted to do this ourselves:). We are very-very grateful for the donations but to whomever it is possible, please send us some more (excavator’s work next week, bathroom tile works (tiles we got for free).